High aerial view down a long, narrow historical pit at Camel Creek, filled with turquoise water, with bushland to the horizon
Camel Creek, August 2020

Australia’s next multi-mine gold & antimony producer

Targeting first production in early 2027.

Great Eastern Gold has established Mining Assets - with a pathway to production already set and underway.

About the company
487,000 ozGold in JORC resources, across four mines
100,000 haOf gold and antimony fields
4Fully permitted mines
Early 2027First production targeted

Projects

Three main mining areas: the Amanda Bel Gold & Antimony Fields, Big Rush and Welcome Again.

  • Flotation
  • CIL
  • Heap leach
  • Column height: JORC ounces of gold
  • Projects close together
  • Processing hub
  • Head office

Positions are indicative. Map data: Natural Earth; elevation from Terrain Tiles (Mapzen, SRTM). Scroll to zoom; drag to move the map; turn it with the arrow buttons, or Shift + drag. Scroll to zoom; drag to move the map; turn it with the arrow buttons, or Shift + drag. Drag to move the map; pinch to zoom. Drag to move the map; turn it with the arrow buttons; pinch to zoom.

All projects

Camel Creek from directly above, September 2026: pits, tracks and the drilling camp among the trees
Camel Creek from above, September 2026: the historical pits and the camp for the 2026 drilling.

One hub, four processing routes

Each mine’s ore goes through the route that suits it, at one central plant at Camel Creek.

Heap leach: higher grade

Feed
The unleached coarse fraction of the Camel Creek Heaps, crushed and leached again, followed by ore from shallow open cuts
Product
Doré gold

Heap leach: lower grade

Feed
The finer material of the Camel Creek Heaps, leached where it lies: an option under evaluation
Product
Doré gold

Flotation circuit

Feed
Camel Creek and Golden Cup: refractory gold, antimony & arsenic ore
Product
Antimony-gold and gold-arsenic concentrates

CIL circuit

Feed
Big Rush, Welcome Again and Amanda Bel Oxide: free-milling ore
Product
Doré gold bars

Strategy and timeline

Get in touch

Submit your enquiry straight through to our team, or contact us directly.
+61 481 838 918
admin@greateasterngold.com.au

Contact us